Skip to main content

Getting Started as a Supplier on GroundControl

This article describes your role as a supplier that has been invited to the platform.

Why You Received a GroundControl Account

Welcome to GroundControl! We're glad to have you here. You might be wondering why you're here in the first place. You received access to GroundControl because one of your receivers (customers) uses our platform to review inspection reports.

Your account lets you create, complete, and submit reports directly to your receivers.

You won't have to pay a thing to use our platform. GroundControl has been offered to you free of charge by one or more of your receivers.

As such, you'll have access to the "Lite" version of GroundControl, which has some restrictions on what you can export from our platform. Instead of exporting and sending out quality packages to your receivers, your data will be made available to your receivers when you click "Submit".

Using GroundControl as a Lite Customer

A Simpler Navigation Menu — On the GroundControl Lite plan, you won't see the full Review section in your sidebar, since those tools aren't part of your plan. If you're a supplier with Parts Tracker access, you'll still see a Parts link there.

Creating a New Customer — If you try to create a new customer while on the Lite plan, you'll see a message explaining that this requires an upgrade, along with a way to reach out to our sales team. The Create button stays disabled until your plan supports it.

To gain access, please reach out to [email protected] or book a demo here.

If you're interested in using GroundControl to create reports for any of your other customers, please contact [email protected] to upgrade to the full version.

Signing in as a New User

When you receive your welcome email, you will also receive a set of instructions to set your password. Follow the instructions and you'll be able to access GroundControl right away.

If you ever need additional user accounts to access GroundControl, feel free to email your primary contact at your receiver or [email protected].

Starting a Report

To create a report in GroundControl, navigate to the "Reports" tab on the left navigation panel. Then in the top right, click "Create New Report".

This will bring up an additional window where you can choose the type of report you'd like to create, as well as the receiver you're building for. The GroundControl logo by a receiver/customer name indicates that they can receive report submissions directly through our platform.

Once created, your report will immediately be opened and set to "In Progress", so you can begin working right away.

Filling Out the Forms

For a First Article Inspection Report, you'll have three Forms to fill out.

Form 1

Contains part and order details—the type of information you would find on a traveler cover letter and purchase order.

Form 2

Contains material/process/test details—the type of information you would find on your material/process certificates of conformance and test reports.

Form 3

Contains characteristics and results—here you would list out the dimensional requirements of a part and your true measured results after production.

Attachments

To supplement all the above information, your ballooned drawings, material certificates, CMM reports, and any additional documentation your receiver requires can all be uploaded directly on our platform for review.

For more detailed descriptions of how our tools work, please check out our User Guides, where we host in-depth video and text instructions on every single tool we offer.

Submitting a Report

Once you have completed a report to your best ability, you can submit the report to your receiver through the "Submit" button on the left navigation panel. If you have any errors or missing information (marked by a red highlighted field), you will be warned of them.

After submission, the status of the report will be set to "Submitted". The report will be locked, and you will no longer be able to make edits.

Understanding Review Outcomes

After clicking Submit, your receiver will be notified to review your submission. At this point, the next steps follow two different paths.

Acceptance

If your receiver accepts your submission, you're all set. No further action is required—your report is completed.

Rejection

If your receiver rejects your submission, you will be given the opportunity to read their reasoning for rejection and make the appropriate edits, as well as send any comments back and forth. Then, you can re-submit your report for another round of review.

This review cycle will repeat until your report has been accepted by the receiver.

Programs and Builds in Parts Tracker

Keeping your terminology for products and production stages separate.

Choosing a Program


The dropdown you use to switch between tracker projects is labeled Program, matching the product the parts go into.

Builds Stay Builds
​
The document level build field, the coverage grid’s build picker, and the Builds applicability list keep the word build, since those refer to a production stage like EVT or DVT.

Resizing and Copying in the Parts Tracker Part Column

Widening the Column


You can drag the edge of the Part / Supplier column header to make room for longer part names.

Copying a Part Name


A part row’s actions menu includes options to copy its part name or part number.

Parts Tracker Configurations

Choosing Which Builds a Part Appears In


A part with no build belongs to every build. You can select if you would like the part to appear in a specific build when you click into the build column. The default option is the newest build, and your build filter selection is remembered for the next visit.

Managing a Part From Its Row Menu


Use the row menu to rename a part. This keeps all the other information regarding your inspection together so you can add suppliers to an existing part without retyping its number and revision.

Revisions and Upload Times


Suppliers can enter a revision when submitting evidence, and customers can edit it later without losing any other information or approvals. Each file will also show the date and time it was uploaded for easy doumentation.

Waiver Notifications


Suppliers receive an email as soon as a reviewer records a waiver decision with the reason and other information regarding the inspection all recorded.

Did this answer your question?